A nameplate total is not enough
A useful assessment records which loads can operate together, motor and compressor starting current, electric heat, pumps, sensitive electronics, and the service configuration. Starting demand can be several times a motor's running demand.
Choose a coverage strategy
Essential-load sizing limits the backed-up panel to priority circuits. Managed whole-home systems use controls to prevent large loads from overlapping. Full-coverage systems still need a diversity and starting analysis—not just the home's service rating.
Fuel and altitude affect output
Available natural-gas pressure and volume must match generator demand while other appliances operate. Altitude and temperature can reduce engine output. Manufacturer derating data and Canadian climate conditions should be included in the final selection.
Information to gather
Collect recent electrical information, panel and service ratings, a major-equipment list, gas meter details, distances, future-load plans, and an outage-priority list. A qualified electrical professional must confirm the load calculation and final equipment selection.