Continuity for buildings and operations

Commercial Generators

Plan standby power around life safety, business continuity, critical equipment, occupancy, and the way your facility actually operates.

Start with operational consequences

Identify loads that protect people, property, inventory, data, access control, communications, pumps, ventilation, and tenant services. Separate code-required emergency systems from optional standby loads and business-continuity priorities.

Define the electrical architecture

Commercial projects may require selective coordination, transfer-switch sequencing, multiple transfer switches, three-phase compatibility, motor-starting analysis, load shedding, and integration with fire alarm or building automation systems.

Confirm fuel performance

Gas demand must be evaluated at full connected load and at the required inlet pressure. Existing building loads, meter and regulator capacity, pipe length, pressure drop, and utility requirements all influence the fuel design.

Commission for the real facility

A complete handover includes witnessed operation, transfer testing, load verification, controls training, documentation, and a maintenance plan. Site-specific design and work belong with appropriately licensed professionals and applicable authorities.

Turn outage priorities into a project brief.

Start the conversation
Equipment & installation

See the generators. Plan the supply.

Explore 15 Cat gas-generator models with official product views, a gas-supply checklist and contractor-finding resources.

Explore the Cat generator guide