Generator Installation Planning: Gas Supply, Electrical Work, Permits, Placement, and Commissioning
A standby generator installation is one coordinated system. Equipment selection, fuel, electrical work, location, approvals, and testing need to be resolved together before commissioning.
Start with loads and a site survey
Define essential and optional loads, starting demand, priorities, service details, future additions, and possible equipment locations. A site visit should identify routing, access, drainage, snow, openings, exhaust direction, neighbouring uses, existing utilities, and service clearances. Begin with the Canadian home sizing guide or commercial planning page as appropriate.
Confirm natural-gas capacity
A licensed gas professional must assess generator demand alongside existing appliances, available pressure, meter and regulator capacity, pipe material and length, pressure drop, routing, protection, bonding, and utility requirements. Existing gas service does not automatically have spare capacity. Gas work must be completed by an appropriately licensed professional.
Coordinate the electrical design
An appropriately licensed electrical professional must confirm load calculations, generator output, transfer-switch arrangement, service rating, grounding and bonding, conductor routing, overcurrent protection, load management, and utility coordination. Commercial or multi-unit sites may involve selective coordination, fire alarm, life-safety, or building-control interfaces.
Resolve placement and permits
Manufacturer instructions and applicable requirements govern clearances, airflow, exhaust, combustible construction, openings, property lines, flood exposure, noise, stable support, snow, and access. Gas and electrical permits, utility review, municipal requirements, and inspections vary by province, territory, municipality, equipment, and site. Confirm them with the authorities having jurisdiction before work starts.
Commission and document the system
Commissioning should verify installation, fuel performance, controls, starting, transfer, load management, retransfer, cooldown, alarms, and safe shutdown according to instructions and approved design. Handover should include manuals, approval records, settings, results, operating guidance, and maintenance planning. Site-specific requirements vary; all gas and electrical work must be completed by appropriately licensed professionals.